Hydraulic Engineering

Hydraulic services resolved against structure, not around it.

Hydraulic is the discipline where coordination most often falls down, because it is gravity-bound. Sanitary drainage cannot be re-routed around a clash the way a duct or a cable tray can — it has to fall, in a set direction, through a structure that was designed by someone else. We set the drainage geometry against the structural model early and hold penetration positions through documentation, which is why our hydraulic packages generate fewer site variations than they otherwise would.

What we deliver

Scope, by project stage.

Stated by stage so you can see exactly what is included at the point you are engaging us — and what is not.

Concept and feasibility

  • Authority servicing enquiry — water, sewer and gas
  • Sanitary drainage strategy and fall analysis
  • Pump, tank and plant spatial allocation
  • Fire and domestic water storage assessment

Development Application

  • Hydraulic services statement
  • Sydney Water and authority pre-lodgement coordination
  • Trade waste and grease arrestor strategy where required
  • Stormwater connection strategy with the civil design

Construction Certificate

  • Cold water, hot water, sanitary, trade waste, gas and stormwater documentation
  • Pipe sizing, pump selection and hydraulic calculations
  • Structural penetration schedules coordinated with the engineer
  • Specification and fixture schedules

Construction phase

  • Shop drawing and hydraulic contractor submission review
  • Authority approval support
  • Site inspection and progressive review
  • Design certification
How we approach it

Three positions we hold on hydraulic.

These are the decisions that determine whether the package works. They are made early, and they are the ones we will argue about.

Falls before layouts

We set the sanitary drainage geometry against the structural model before the hydraulic layout is drawn. It is the single decision that determines whether a hydraulic package coordinates or fights, and it cannot be recovered later without either a bulkhead or a transfer.

Penetrations are agreed once

Every structural penetration is scheduled, dimensioned and issued to the structural engineer as a coordinated package, not marked up on site. Late penetration requests are among the most common causes of programme loss on a services package.

Authority approvals are tracked as programme items

Sydney Water and equivalent authority approvals have real lead times that are frequently discovered rather than planned. We start the servicing enquiry at concept and report approval status against the programme.

Where it matters

Sectors and framework.

Compliance is the floor. Constructability, maintainability and long-term value carry equal weight.

Sectors

ResidentialCommercialEducationHealthcareHospitalityIndustrialMixed-use

Design framework

  • AS/NZS 3500 series
  • NCC Volume Three (Plumbing Code of Australia)
  • AS 2419.1 where fire water storage is shared
  • Water authority technical requirements
Selected Projects

Recent projects.

Residential, education, student accommodation, hospitality, alpine and industrial projects delivered across Australia.

All projects
Common questions

Hydraulic Engineering.

Marked up as FAQPage structured data — the correct structure for AI answer engines as well as for search.

Yes. Servicing enquiries, Section 73 coordination and water servicing coordinator liaison are part of the hydraulic scope rather than a client responsibility handed back at documentation.

Shared storage is assessed jointly with the fire protection design. Where a combined tank is viable it usually reduces both plant footprint and capital cost, but it has to be resolved at concept because it drives the tank room size.

Yes — grease arrestor sizing, trade waste applications and the associated authority approvals are documented as part of the hydraulic package.

Yes, issued as a coordinated package to the structural engineer. Penetrations resolved in documentation cost a mark-up. Penetrations resolved on site cost a core drill and an engineering assessment.